To allow for works to be undertaken safely on an internal inspection of the Forth Road Bridge main cables, the footway/cycleway that is open to the public will be changed on a number of days during April and May.
The east footway will be closed to the public and the west footway will be open on the following dates:
The east footway/cycleway will be open to the public at all other times.
Both footways will be open on weekends.